Measured low velocity, revised execution, verified recheck
Live readings showed two 4 inch branches below the calculated target while the mains were passing. The crew revised valve positions and staged the temporary pumping to isolate the low branches. Rechecks met target the same shift, and the closeout log records the initial reading, the adjustment and the passing recheck.
