Process piping passivation ahead of commissioning
Circuit planning, citric passivation, rinse and verification for hygienic process piping. Turnover package delivered with procedures, logs and test results.
Cleansol plans and executes specialized cleaning, passivation, derouging and oxygen cleaning for hygienic process and utility systems. We support project teams from pre-construction scope development through measured field execution, verification and documented turnover.
Specialized field-services contractor for hygienic process and utility systems.
Cleansol is a specialized field-services contractor for hygienic process and utility systems in the Life Sciences, Data Center, Semiconductor and Food & Beverage industries. We work with owners, engineers and mechanical contractors to plan and execute cleaning, passivation, derouging and oxygen cleaning scopes, then provide the records needed for turnover.
Services
On-site preparation, treatment, rinse, verification and documentation for stainless steel piping, tanks and equipment.
Passivation DerougingAssessment, compatible chemistry selection, removal, rinse, re-passivation and verification, planned around your shutdown.
Derouging Chemical CleaningChemistry and procedure selected for the contaminant, the metallurgy, the system configuration and your requirements.
Chemical Cleaning Oxygen & High-Purity GasCleaning, inspection and preservation for systems and equipment intended for oxygen or specified high-purity gas service.
Oxygen & High-Purity Gas Cleaning Hydronic Cleaning & FlushingCircuit planning by pipe size, flushing and filtration, with velocity verified live by portable non-invasive meters.
Hydronic System Cleaning & Flushing Equipment Exterior CleaningPlanned exterior cleaning and surface restoration for process equipment, with containment and material compatibility considered.
Equipment Exterior CleaningPre-Construction
Successful field execution begins with an executable plan. Cleansol reviews drawings and specifications, defines circuits and temporary connections, calculates volumes and flow requirements, plans equipment and filtration, and aligns responsibilities, labor and schedule before mobilization.
P&IDs, plans, specifications, system list, pipe sizes, metallurgy, schedule and acceptance requirements.
Circuit boundaries, temporary connections, high and low points, valves, isolation and access.
Volumes, flow targets, chemistry, pumping, filtration, instrumentation, labor and sequence.
Required readings, samples, logs, calibrations, approvals and the customer closeout format.
Circuits, temporary connections, valve positions and monitoring points.
Volumes, flow targets, equipment, labor and schedule assumptions.
Scope alignment among owner, engineer, CM, mechanical contractor and Cleansol.
Data Centers
Technology cooling systems, CDU circuits and direct-to-chip loops increasingly run stainless piping with high-purity, low-conductivity coolant. In those systems corrosion products are unacceptable, and passivation stops being a pharma word and becomes a commissioning requirement.
Cleansol brings the same metallurgy work it has performed in regulated facilities since 2016: in-system passivation after cleaning and before fill, prefabricated skid and module cleaning at the shop or on delivery, and turnover records built to survive commissioning review.
Two Systems, Two Disciplines
Data center cooling splits into a hydronic side and a hygienic side. Hydronic flushing scopes, including glycol and specified heat-transfer-fluid filling, are delivered through Cleanhydronics. Stainless passivation and specialty cleaning scopes are delivered by Cleansol. Same crews, same documentation standard, one project.
The Guardrail
Passivation is not required on every cooling system. On a conventional carbon steel chilled water loop it is generally not applicable, and we will tell you so.
Cleansol modular cart platform (engineering model)
Equipment and Controlled Execution
Cleansol configures modular pumping, heating, filtration and instrumentation around the requirements of each system. Key process variables can be displayed, monitored and recorded throughout execution, creating a traceable project record.
Documentation
CLEANDOC is Cleansol's turnover documentation package. Contents follow the project scope and your closeout format, defined before execution so the record is complete when the work is.
A redacted sample index is available for review during scope development.
Industries
Project Experience
Customer identities are withheld where confidentiality agreements apply. Scope and deliverables are stated as executed.
Circuit planning, citric passivation, rinse and verification for hygienic process piping. Turnover package delivered with procedures, logs and test results.
Chemistry selected for the contaminant and metallurgy, executed inside the outage window with rinse verification and complete records.
Condition assessment, compatible chemistry, removal, rinse and re-passivation executed inside the outage window with verification records.
Next Step
Planning a new system, shutdown or remediation scope? Send the available drawings, specification, project location and schedule. Cleansol will review the information, identify missing scope inputs and recommend the appropriate next step.
Bid documents in hand and a due date on the calendar. Send scope, drawings, project location and bid date.
Send Drawings or SpecificationsDesign is moving and the cleaning scope is not defined yet. That is the right time to involve us.
Send Drawings for a Pre-Construction ReviewA system condition or schedule problem that cannot wait for email.
919.803.7507 Project Response LineWe review project inquiries promptly and follow up as quickly as your project timeline allows. Quote timing depends on the completeness and complexity of the scope.