FIELD SERVICES / MOBILIZED NATIONALLY FROM GARNER, NC 919.803.7507 Active bid? Send specifications
Cleansol
Menu

Home / Services / Oxygen & High-Purity Gas

Oxygen and High-Purity Gas System Cleaning

Systems carrying oxygen or high-purity gas require cleaning to the applicable standard and the customer specification. Cleansol executes field and shop scopes against those requirements.

IMAGE: Licensed commercial photo of stainless steel high-purity gas piping and fittings
alt: Stainless steel high-purity gas distribution piping with fittings and valves

The Buyer Problem

Oxygen and high-purity gas systems require a specific cleaning standard

Hydrocarbon contamination in an oxygen system creates a fire and explosion risk. Particulate and residue in high-purity gas systems cause process excursions and equipment damage. Standard industrial cleaning does not meet these requirements.

The applicable standard, the customer specification and the system design govern the cleaning method, the verification approach and the preservation requirements. Cleansol executes to what the specification calls for.

Systems Covered

  • Oxygen distribution systems
  • High-purity gas piping and distribution systems
  • Components and subassemblies (shop scope)
  • Field-installed piping systems
  • Other gas systems where the specification requires oxygen-level cleaning

When It Is Required

  • The system carries oxygen at any pressure above atmospheric
  • The specification references ASTM G93/G93M, CGA G-4.1 or equivalent, as applicable
  • The customer quality plan or OEM requirement calls for oxygen-level cleanliness
  • System components or assemblies are being re-commissioned after repair or modification

Standards Are Referenced as Applicable to the Customer Specification

ASTM G93/G93M and CGA G-4.1 describe cleaning methods and verification approaches. The applicable revision and the specific requirements are defined by the customer specification, not by Cleansol. We execute to what the documents call for.

Cleansol Scope of Work

How oxygen cleaning runs

Specification review and scope confirmation

The applicable standard, the customer specification and the system design are reviewed before work begins. The cleaning method, verification approach and preservation requirements are confirmed.

Preliminary degreasing

Visible contamination and hydrocarbon residue are removed using approved solvents or aqueous cleaning agents, depending on the specification and the system configuration.

Final cleaning

The final cleaning method is executed per the approved procedure and the applicable standard. Field and shop scopes use methods appropriate to the system configuration and the accessible surfaces.

Cleanliness verification

Verification testing per the specification is performed and recorded. Test methods and acceptance criteria follow the referenced standard and the project documents.

Preservation, packaging and tagging

Where the scope includes preservation and packaging, systems or components are sealed and tagged per the approved procedure. Packaging materials are confirmed compatible with the service.

IMAGE: Licensed commercial photo of clean-room-grade pipe fittings and components for high-purity applications
alt: High-purity gas fittings and components staged for installation in a controlled environment

Field and Shop Scope Boundaries

Shop cleaning is practical for components and subassemblies before installation. Field cleaning addresses installed piping systems where access and the system configuration permit. The scope boundary is established during the pre-mobilization review.

Scope Alignment

Who does what, agreed before mobilization

Cleansol

Procedure development and approval, cleaning execution, verification testing in scope, preservation and packaging if included, and documentation.

Customer / Owner

Applicable standard identification, customer specification, acceptance criteria, access to systems or components and approval of the proposed procedure.

Engineering

Specification requirements, applicable standard designation, any special material or compatibility requirements, and resolution of questions raised in the scope review.

Mechanical trade

Component or system availability for cleaning, temporary isolation, and re-installation of cleaned components at the agreed schedule milestones.

Information We Need Early

  • The applicable standard and specific revision if referenced
  • Customer specification sections governing cleanliness
  • System or component list with materials and sizes
  • Verification and acceptance criteria
  • Preservation and packaging requirements if included

Site Considerations

  • Access to systems or components for cleaning and verification
  • Solvent handling, containment and ventilation requirements
  • Compatibility of cleaning agents with adjacent materials
  • Re-contamination prevention during the cleaning window

Verification and Acceptance

Verified against the applicable standard and specification

Verification methods follow the applicable standard and the customer specification. Visual inspection and testing are performed and results are recorded against the acceptance criteria in the project documents.

  • Visual inspection per the applicable standard
  • Testing methods per the specification
  • Results recorded and documented
  • Preservation and packaging confirmed if in scope

Turnover Deliverables

Approved procedure

The procedure the work was executed against, referencing the applicable standard and specification.

Cleaning and chemical records

Materials used and any operating data recorded through the cleaning process.

Verification results

Test results recorded against the acceptance criteria.

CLEANDOC package

Assembled in the closeout format agreed before execution.

Representative Project

Anonymized, within NDA limits

IndustrySemiconductor
RegionSoutheast
PhaseNew construction

High-purity gas distribution system cleaning and verification

Shop and field cleaning of stainless steel high-purity gas distribution piping per the customer specification and applicable standard. Verification testing performed and recorded. Preservation and end-cap installation completed before system handoff.

Next Step

Have an oxygen or high-purity gas cleaning requirement?

Send the specification section, the applicable standard designation, the system or component list and the schedule window. Cleansol will confirm the scope boundary and recommend the appropriate next step.

We review project inquiries promptly and follow up as quickly as your project timeline allows.

919.803.7507 Project Response Line